Pradhan Mantri Gram Sadak Yojna Department :
1. Introduction
Government of India have launched the Pradhan Mantri Gram Sadak Yojana on 25th December, 2000 to provide all-weather access to unconnected habitations. Pradhan Mantri Gram Sadak Yojana (PMGSY) is a 100% Centrally Sponsored Scheme
2. Programme Objectives
The primary objective of the PMGSY is to provide Connectivity, by way of an all-weather road (with necessary culverts and cross-drainage structures), to the eligible unconnected Habitations in the rural areas.
Web Site :- Detal information of PMGSY in Latur District is available on http://pmgsyonline.nic.in/Citizens/en/DIST/05DP/DistrictProfile.asp?state=MH&district=16
Works Completed & Ongoing Works
|
|||||||||||||||||||||||||||||||||||||
PMGSY. Progress Report Dist. Latur Upto Date 30 / 04 /2010 | |||||||||||||||||||||||||||||||||||||
Sr. No. | Phase | Package No. | Programme Year | No.of Works Sanctioned | Length in Km. | Tendered Amount in Lakh | Received Grants up to 30.04.2010in Lakh | No.of work Completed | Total Expenditure upto 2007-08 in Lakh | Expenditure in 2008-09 in Lakh | Expenditure in 2009-10 in Lakh | Total Expenditure upto 30.04.2010 in Lakh | Remark | ||||||||||||||||||||||||
Up to 3/2006 | 2006-07 | 2007-08 | 2008-09 | 2009-10 | Total | ||||||||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | |||||||||||||||||||
1 | II | MH 16-02 | 2001-03 | 9 | 26.60 | 279.48 | 650.00 | 0.00 | 0.00 | 0.00 | 0.00 | 650.00 | 9 | 291.48 | 0.00 | 0.00 | 291.48 | All works Completed & Final Payment made | |||||||||||||||||||
2 | II | MH 16-03 | 2001-03 | 11 | 21.64 | 277.58 | 0.00 | 11 | 278.23 | 0.00 | 0.00 | 278.23 | |||||||||||||||||||||||||
3 | III | MH 16-04 | 2003-04 | 9 | 22.01 | 252.29 | 236.79 | 13.85 | 0.00 | 0.00 | 0.00 | 250.64 | 9 | 242.78 | 0.00 | 0.00 | 242.78 | ||||||||||||||||||||
4 | IV | MH 16-05 | 2004-05 | 4 | 9.95 | 121.51 | 41.80 | 0.38 | 0.00 | 0.00 | 0.00 | 42.18 | 4 | 122.47 | 0.00 | 0.00 | 122.47 | ||||||||||||||||||||
5 | V | MH 16-06 to 15 | 2005-06 | 59 | 141.51 | 2285.73 | 0.00 | 750.00 | 0.00 | 0.00 | 0.00 | 750.00 | 59 | 2158.42 | 0.00 | 49.48 | 2207.90 | All Works Completed | |||||||||||||||||||
6 | VI | MH 16-16 to 25 | 2006-07 | 10 | 130.63 | 3692.53 | 0.00 | 0.00 | 0.00 | 3507.84 | 0.00 | 3507.84 | 10 | 0.00 | 2643.86 | 826.97 | 3470.83 | All works Completed | |||||||||||||||||||
7 | VII | MH 16-26 to 31 | 2007-08 | 22 | 108.40 | 2712.52 | 0.00 | 0.00 | 0.00 | 0.00 | 1125.00 | 1125.00 | 0 | 0.00 | 0.00 | 811.00 | 1079.37 | All Works are in Progress | |||||||||||||||||||
8 | VIII | MH 16-32 to 41 | 2008-09 | 18 | 78.38 | 2318.18 | 0.00 | 0.00 | 0.00 | 0.00 | 345.00 | 345.00 | 0 | 0.00 | 0.00 | 113.14 | 164.07 | All Works are in Progress | |||||||||||||||||||
Total | 142 | 539.12 | 11939.82 | 928.59 | 764.23 | 0 | 3507.84 | 1470.00 | 6670.66 | 102 | 3093.38 | 2643.86 | 1800.59 | 7857.13 |
PRADHAN MANTRI GRAM SADAK YOJANA 2010-11 | ||||||||
Form : 7 | ||||||||
Name of State : MAHARASHTRA | Phase : VII | |||||||
State Code : MH-16 | Month : April 2010 | |||||||
SR.No. | Name of Block | Package No. | Name of Road | Sanctioned Cost (Rs. in Lakhs) | Length (In Kms) | Date of Work Order (dd/mm/yy) | Name of Contractor | Stipulated Date of Completion |
1 | 4 | 5 | 6 | 7 | 8 | 10 | 11 | 11 |
1 | Ausa | MH-16-26 | Ausa - Sarola (T16) | 204.95 | 9.5 | 24-08-2009 | M/S Minar Construction Latur | 24-08-2010 |
2 | Ausa | MH-16-26 | Nagarsoga - Talni (T14) | 256.35 | 13.8 | 24-08-2009 | 24-08-2010 | |
3 | Nilanga | MH-16-27 | MDR-31 To Sitaphalwadi ( L-092) | 52.93 | 2.20 | 20-07-2009 | Shri S.N Khatib Const. Nilanga | 20-07-2010 |
4 | Nilanga | MH-16-27 | SH-167 To Machratwadi ( L-061) | 59.57 | 2.40 | 20-07-2009 | 20-07-2010 | |
5 | Nilanga | MH-16-27 | SH--167 To Bujrugwadi( L-080) | 40.29 | 1.80 | 20-07-2009 | 20-07-2010 | |
6 | Nilanga | MH-16-27 | ODR-83 To Ambegaon(M.) L-082 | 20.51 | 1.02 | 20-07-2009 | 20-07-2010 | |
7 | Nilanga | MH-16-27 | ODR-83 Rathoda tanda To rathoda Road( L-079) | 100.93 | 4.40 | 20-07-2009 | 20-07-2010 | |
8 | Nilanga | MH-16-27 | SH-166(kavthapati) To Gouar (L-085) | 70.76 | 2.75 | 20-07-2009 | 20-07-2010 | |
9 | Nilanga | MH-16-27 | SH-165 To Makani To Chanachiwadi( L-041) | 175.1 | 6.50 | 20-07-2009 | 20-07-2010 | |
10 | Nilanga | MH-16-27 | Jajnoor To Jajnoor Zopadpatti (L-076) | 85.76 | 3.60 | 20-07-2009 | 20-07-2010 | |
11 | Shirur Anantpal | MH-16-27 | Hippalgaon - Sawargaon( L049) | 76.69 | 2.7 | 18-07-2009 | 18-07-2010 | |
12 | Deoni | MH16-28 | Bombli - Korewadi (L039) | 84.65 | 2.27 | 14-07-2009 | Shri B.R .Andhe Latur | 14-07-2010 |
13 | Udgir | MH16-28 | SH-168 - Shirol Janapur to State Border (T04) | 179.27 | 12.00 | 14-07-2009 | 14-07-2010 | |
14 | Udgir | MH16-28 | SH-17 - Dongraj (T13) | 253.37 | 7.84 | 14-07-2009 | 14-07-2010 | |
15 | Ahmadpur | MH16-29 | SH-156 Ugilewadi Sawargaon Rokda to Himpalner road (T11/T16) | 284.68 | 11.52 | 18-07-2009 | M/s Rohini Construction Ahmadpur | 18-07-2010 |
16 | Chakur | MH16-30 | MSH-3 To Mohanal (L-067) | 36.12 | 1.37 | 28-07-2009 | Rudrani Infrastructure Pvt.Ltd.Aurangabad | 28-07-2010 |
17 | Chakur | MH16-30 | MDR-19 to Shivni Majara (L061) | 67.86 | 1.1 | 28-07-2009 | 28-07-2010 | |
18 | Chakur | MH16-30 | Zari to Ganesh Nagar, Fattu Naiek Tanda (L061) | 92.2 | 2.87 | 28-07-2009 | 28-07-2010 | |
19 | Renapur | MH16-31 | Karepur to VR 16 (L0-35) | 64.78 | 2.97 | 23-07-2009 | M/s Vaishali Construction Latur | 28-07-2010 |
20 | Renapur | MH16-31 | S.H.144 to Darjiborgaon, Indarthana (T0-11) | 249.4 | 9.24 | 23-07-2009 | 23-07-2010 | |
21 | Latur | MH16-31 | M.D.R. 10 to Raiwadi, Nandgaon( L0-63) | 106.63 | 3.95 | 23-07-2009 | 23-07-2010 | |
22 | Latur | MH16-31 | M.D.R. 10 to Shiur (L0-34) | 35.68 | 2.6 | 23-07-2009 | 23-07-2010 | |
Total | 2598.48 | 108.4 | …… | ….. | …… |
|
|||||||||||||||||||||||||||||||
"PROGRESS REPORT" (Form 8 ) | |||||||||||||||||||||||||||||||
Name of State : MAHARASHTRA | Phase : VII | ||||||||||||||||||||||||||||||
State Code : MH-16 | Month : April 2010 | ||||||||||||||||||||||||||||||
Sr. No. | Name of District | District Code | Name of Block | Package No | Name of Road | Road Length | U / N | Sanctioned Cost (Rs. in Lakhs) | Value of Work done Rs. In lakh | Payment Made In | Remarks | ||||||||||||||||||||
Up to Last Month | During This Month | Total | Up to Last Month | During This Month | Total | ||||||||||||||||||||||||||
1 | 2 | 3 | 4 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | ||||||||||||||||
1 | Latur | 16 | Ausa | MH-16-26 | Ausa - Sarola (T16) | 9.5 | U | 204.95 | 74.54 | 0.00 | 174.17 | 74.54 | 0.00 | 174.17 | Carpet in Progress | ||||||||||||||||
2 | Latur | 16 | Ausa | MH-16-26 | Nagarsoga - Talni (T14) | 13.8 | U | 256.35 | 17.77 | 0.00 | 148.09 | 17.77 | 0.00 | 148.09 | Carpet in Progress | ||||||||||||||||
3 | Latur | 16 | Nilanga | MH-16-27 | Upgradation to MDR-31 To Sitaphalwadi ( L-092) | 2.20 | U | 52.93 | 11.22 | 0.00 | 11.22 | 11.22 | 0.00 | 11.22 | MPM in progress | ||||||||||||||||
4 | Latur | 16 | Nilanga | MH-16-27 | Upgradation to SH-167 To Machratwadi ( L-061) | 2.40 | U | 59.57 | 20.76 | 0.00 | 20.76 | 20.76 | 0.00 | 20.76 | MPM in progress | ||||||||||||||||
5 | Latur | 16 | Nilanga | MH-16-27 | Upgradation to SH--167 To Bujrugwadi( L-080) | 1.80 | U | 40.29 | 0.50 | 0.00 | 0.50 | 0.50 | 0.00 | 0.50 | MPM in progress | ||||||||||||||||
6 | Latur | 16 | Nilanga | MH-16-27 | Upgrdation To ODR-83 To Ambegaon(M.) L-082 | 1.02 | U | 20.51 | 3.96 | 0.00 | 3.96 | 3.96 | 0.00 | 3.96 | MPM in progress | ||||||||||||||||
7 | Latur | 16 | Nilanga | MH-16-27 | Upgrdation To ODR-83 Rathoda tanda To rathoda Road( L-079) | 4.40 | U | 100.93 | 22.91 | 0.00 | 22.91 | 22.91 | 0.00 | 22.91 | MPM in progress | ||||||||||||||||
8 | Latur | 16 | Nilanga | MH-16-27 | Upgradation To SH-166(kavthapati) To Gouar (L-085) | 2.75 | U | 70.76 | 12.91 | 0.00 | 23.79 | 12.91 | 0.00 | 23.79 | MPM in progress | ||||||||||||||||
9 | Latur | 16 | Nilanga | MH-16-27 | Upgradation To SH-165 To Makani To Chanachiwadi( L-041) | 6.50 | U | 175.1 | 33.71 | 0.00 | 65.18 | 33.71 | 0.00 | 65.18 | MPM in progress | ||||||||||||||||
10 | Latur | 16 | Nilanga | MH-16-27 | Upgradation To Jajnoor To Jajnoor Zopadpatti (L-076) | 3.60 | U | 85.76 | 30.95 | 0.00 | 30.95 | 30.95 | 0.00 | 30.95 | MPM in progress | ||||||||||||||||
11 | Latur | 16 | Shirur Anantpal | MH-16-27 | Hippalgaon - Sawargaon( L049) | 2.7 | U | 76.69 | 7.57 | 0.00 | 31.59 | 7.57 | 0.00 | 31.59 | MPM in progress | ||||||||||||||||
12 | Latur | 16 | Deoni | MH16-28 | Bombli - Korewadi (L039) | 2.27 | U | 84.65 | 21.35 | 0.00 | 67.61 | 21.35 | 0.00 | 67.61 | Carpet in Progress | ||||||||||||||||
13 | Latur | 16 | Udgir | MH16-28 | SH-168 - Shirol Janapur to State Border (T04) | 12.00 | U | 179.27 | 79.72 | 0.00 | 126.13 | 79.72 | 0.00 | 126.13 | Carpet in Progress | ||||||||||||||||
14 | Latur | 16 | Udgir | MH16-28 | SH-17 - Dongraj (T13) | 7.84 | U | 253.37 | 60.04 | 0.00 | 169.54 | 60.04 | 0.00 | 169.54 | Arch Bridge & Carpet in Progress | ||||||||||||||||
15 | Latur | 16 | Ahmadpur | MH16-29 | SH-156 Ugilewadi Sawargaon Rokda to Himpalner road (T11/T16) | 11.52 | U | 284.68 | 20.83 | 0.00 | 98.64 | 20.83 | 0.00 | 98.64 | MPM in progress | ||||||||||||||||
16 | Latur | 16 | Chakur | MH16-30 | Upgradation to MSH-3 To Mohanal (L-067) | 1.37 | U | 36.12 | 5.85 | 0.00 | 10.43 | 5.85 | 0.00 | 10.43 | MPM in progress | ||||||||||||||||
17 | Latur | 16 | Chakur | MH16-30 | Upgradation toMDR-19 to Shivni Majara (L061) | 1.1 | U | 67.86 | 25.05 | 0.00 | 47.04 | 25.05 | 0.00 | 47.04 | Arch Bridge & Carpet in Progress | ||||||||||||||||
18 | Latur | 16 | Chakur | MH16-30 | Upgrdation of Zari to Ganesh Nagar, Fattu Naiek Tanda (L061) | 2.87 | U | 92.2 | 29.25 | 0.00 | 39.64 | 29.25 | 0.00 | 39.64 | MPM in progress | ||||||||||||||||
19 | Latur | 16 | Renapur | MH16-31 | Karepur to VR 16 (L0-35) | 2.97 | U | 64.78 | 5.77 | 0.00 | 43.85 | 5.77 | 0.00 | 43.85 | Carpet in Progress | ||||||||||||||||
20 | Latur | 16 | Renapur | MH16-31 | S.H.144 to Darjiborgaon, Indarthana (T0-11) | 9.24 | U | 249.4 | 13.98 | 0.00 | 82.92 | 13.98 | 0.00 | 82.92 | MPM in progress | ||||||||||||||||
21 | Latur | 16 | Latur | MH16-31 | M.D.R. 10 to Raiwadi, Nandgaon( L0-63) | 3.95 | U | 106.63 | 14.10 | 0.00 | 18.91 | 14.10 | 0.00 | 18.91 | MPM in progress | ||||||||||||||||
22 | Latur | 16 | Latur | MH16-31 | M.D.R. 10 to Shiur (L0-34) | 2.6 | U | 35.68 | 6.51 | 0.00 | 17.26 | 6.51 | 0.00 | 17.26 | MPM in progress | ||||||||||||||||
Total | 108.4 | 2598.48 | 519.25 | 0.00 | 1255.09 | 519.25 | 0.00 | 1255.09 |
|
|||||||||||||||||||
Form : 7 | |||||||||||||||||||
Name of State : MAHARASHTRA | Phase: VIII | ||||||||||||||||||
State Code : MH-16 | Month : April 2010 | ||||||||||||||||||
Sr.No | Block | Package | Name of Road | (U/N) | Sanctioned Cost Rs. In Lakhs | Length in [Kms] | Date Of Work Order | Name Of Contractor | Stipulated Date Of Compleation | ||||||||||
1 | Ausa | MH1632 | Ekambi Tanda - Chincholi K( L021) | U | 255.58 | 8.86 | 14-12-2009 | Dhanchandra Construction Latur | 14-12-2010 | ||||||||||
2 | Ausa | MH1632 | Boaregaon - Kawatha Kej ( L071) | U | 14.2 | 0.6 | |||||||||||||
3 | Nilanga | MH1633 | Upgradation To SH-167 To Chandori. (L-042) | U | 250.94 | 12.12 | 10-12-2009 | M/s Minar Constuction Latur | 10-12-2010 | ||||||||||
4 | Nilanga | MH1634 | Upgradation to SH-167 To Dongargaon(H.) (T-12) | U | 230.73 | 10.32 | 11-12-2009 | M/s Bhavani Const. | 11-12-2010 | ||||||||||
5 | Nilanga | MH1635 | Upgrdation To Sh-163 to Mirganhalli( L-054) | U | 31.3 | 1.10 | 21-12-2009 | Shri.S.N Khatib Cons.& Co.Nilanga | 21-12-2010 | ||||||||||
6 | Nilanga | MH1635 | Upgradation to SH-167 To Sabitwadi (L-052) | U | 61.36 | 2.25 | |||||||||||||
7 | Nilanga | MH1635 | Upgradation To SH-163 To Mudgadwadi (L-059) | U | 14.71 | 0.60 | |||||||||||||
8 | Deoni | MH1636 | MDR-25 - Kumdal (H) (L050) | U | 26.8 | 0.84 | 11-12-2009 | Reddy Const.Latur | 11-12-2010 | ||||||||||
9 | Deoni | MH1636 | SH166 - Sangam (L027) | U | 83.81 | 1.2 | |||||||||||||
10 | Udgir | MH1636 | T-13 - Hanmuntwadi (L066) | U | 80.88 | 2.65 | |||||||||||||
11 | Udgir | MH1636 | T-13 - Karlewadi , Wanjarwadi( L068) | U | 26.35 | 0.96 | |||||||||||||
12 | Udgir | MH1637 | Pir Tanda - Dongarshelaki Tanda (L081) | U | 82.75 | 2.6 | 10-12-2009 | Shri.B.R.Andhe | 10-12-2010 | ||||||||||
13 | Jalkot | MH1637 | Dist. Border Umerdara Wanjarwad to SH-225 (T10) | U | 157.51 | 6.5 | |||||||||||||
14 | Ahmadpur | MH1638 | MDR-38 Tirth Dhanora Unni Hippalgaon Hadolti road (T02) | U | 354.81 | 11.5 | 22-12-2009 | B.S.Pawar Latur | 22-12-2010 | ||||||||||
15 | Ahmadpur | MH1639 | MSH-3 Shenni Anandwadi road (L099) | U | 77.29 | 2.8 | 12-12-2009 | Rohini Construction Ahamadpur | 12-12-2010 | ||||||||||
16 | Renapur | MH1640 | S.H.144 to Jawalga,Selu( T0-3) | U | 348.48 | 9.16 | 09-12-2009 | M/s Ashirwad Construction Garsuli Tq. Latur. | 09-12-2010 | ||||||||||
17 | Latur | MH1641 | O.D.R-20 to Khulgapur (L0-69) | U | 82.87 | 3.09 | 12-12-2009 | Reddy Const.Latur | 12-12-2010 | ||||||||||
18 | Latur | MH1641 | MSH-3 to Sikandarpur(L0-29) | U | 30.67 | 1.23 | |||||||||||||
Total | 2211.04 | 78.38 | …. | …. | …. |
|
|||||||||||||||||
PRADHAN MANTRI GRAM SADAK YOJANA 2010-11 | |||||||||||||||||
"PROGRESS REPORT" (Form 8 ) | |||||||||||||||||
Phase: VIII | |||||||||||||||||
Name of State : MAHARASHTRA | Month : April 2010 | ||||||||||||||||
State Code : MH-16 | |||||||||||||||||
Sr. No. | Name of District | District Code | Name of Block | Package No | Name of Road | Road Length | U / N | Road No | Sanctioned Cost Rs. In Lakhs | Value of Work done Rs. In lakh | Payment Made In | Remarks | |||||
Up to Last Month | During This Month | Total | Up to Last Month | During This Month | Total | ||||||||||||
1 | 2 | 3 | 4 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | |
1 | Latur | 16 | Ausa | MH1632 | Ekambi Tanda - Chincholi K( L021) | 8.86 | U | 1 | 255.58 | 0.00 | 50.93 | 50.93 | 0.00 | 50.93 | 50.93 | Box Cell Bridge & WBM Progress | |
2 | Latur | 16 | Ausa | MH1632 | Boaregaon - Kawatha Kej ( L071) | 0.6 | U | 2 | 14.2 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work ,CD works in Progress | |
3 | Latur | 16 | Nilanga | MH1633 | Upgradation To SH-167 To Chandori. (L-042) | 12.12 | U | 1 | 250.94 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | MPM in Progress | |
4 | Latur | 16 | Nilanga | MH1634 | Upgradation to SH-167 To Dongargaon(H.) (T-12) | 10.32 | U | 1 | 230.73 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work ,CD works in Progress | |
5 | Latur | 16 | Nilanga | MH1635 | Upgrdation To Sh-163 to Mirganhalli( L-054) | 1.10 | U | 1 | 31.3 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work ,CD works in Progress | |
6 | Latur | 16 | Nilanga | MH1635 | Upgradation to SH-167 To Sabitwadi (L-052) | 2.25 | U | 2 | 61.36 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work ,CD works in Progress | |
7 | Latur | 16 | Nilanga | MH1635 | Upgradation To SH-163 To Mudgadwadi (L-059) | 0.60 | U | 3 | 14.71 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work ,CD works in Progress | |
8 | Latur | 16 | Deoni | MH1636 | MDR-25 - Kumdal (H) (L050) | 0.84 | U | 1 | 26.8 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work ,CD works in Progress | |
9 | Latur | 16 | Deoni | MH1636 | SH166 - Sangam (L027) | 1.2 | U | 2 | 83.81 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Box Cell Bridge & WBM Progress | |
10 | Latur | 16 | Udgir | MH1636 | T-13 - Hanmuntwadi (L066) | 2.65 | U | 3 | 80.88 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | WBM work & CD woek in Progress | |
11 | Latur | 16 | Udgir | MH1636 | T-13 - Karlewadi , Wanjarwadi( L068) | 0.96 | U | 4 | 26.35 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work in Progress | |
12 | Latur | 16 | Udgir | MH1637 | Pir Tanda - Dongarshelaki Tanda (L081) | 2.6 | U | 1 | 82.75 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work in Progress | |
13 | Latur | 16 | Jalkot | MH1637 | Dist. Border Umerdara Wanjarwad to SH-225 (T10) | 6.5 | U | 2 | 157.51 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work ,CD works in Progress | |
14 | Latur | 16 | Ahmadpur | MH1638 | MDR-38 Tirth Dhanora Unni Hippalgaon Hadolti road (T02) | 11.5 | U | 1 | 354.81 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Earth work ,CD works in Progress | |
15 | Latur | 16 | Ahmadpur | MH1639 | MSH-3 Shenni Anandwadi road (L099) | 2.8 | U | 1 | 77.29 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | WBM in progress | |
16 | Latur | 16 | Renapur | MH1640 | S.H.144 to Jawalga,Selu( T0-3) | 9.16 | U | 1 | 348.48 | 113.14 | 0.00 | 113.14 | 113.14 | 0.00 | 113.14 | Earth work ,CD works in Progress | |
17 | Latur | 16 | Latur | MH1641 | O.D.R-20 to Khulgapur (L0-69) | 3.09 | U | 1 | 82.87 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | MPM completed | |
18 | Latur | 16 | Latur | MH1641 | MSH-3 to Sikandarpur(L0-29) | 1.23 | U | 2 | 30.67 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | MPM completed | |
78.38 | 0 | 30 | 2211.04 | 113.14 | 50.93 | 164.07 | 113.14 | 50.93 | 164.07 |